Welcome to visitShenzhen Jintianlei Innovation Technology Co., Ltd.Official Website!
PCBA

PCBA Manufacturer in Shenzhen

Kilandu: PCBA Manufacturer in Shenzhen

Kilandu (Shenzhen Jintianlei Innovation Technology Co., Ltd.) is a turnkey PCBA manufacturer located in Bao'an District, Shenzhen, Guangdong, China. From our factory we deliver SMT assembly, DIP through-hole, and full turnkey PCBA services to OEMs across Europe, Russia, and the Americas.

Manufacturing Capacity

  • 4 Yamaha high-speed SMT lines (YS24 + YS12) and 3 automatic DIP lines
  • Up to 150 million components placed per month
  • 150 plus staff including 20 plus engineers for DFM, NPI, and test
  • IPC-A-610 Class 2 and 3 workmanship; RoHS and REACH compliant
  • Typical lead time 2 to 5 weeks from prototype to volume

Quality Certifications

  • IATF 16949:2016 automotive quality management
  • ISO 9001:2015 quality management
  • ISO 13485:2016 medical device quality
  • ISO 14001:2015 environmental management
  • UL File No. E352816

Industries We Serve

We build PCBA for industrial control, automotive electronics, LED drivers, power electronics, energy storage and inverter systems, and EV charging equipment. With more than 3,000 OEM projects delivered, our team supports both low-volume prototypes and high-mix production.

Turnkey Engineering Support

Kilandu provides component sourcing, SMT and DIP assembly, conformal coating, ICT and functional testing, and final box-build. Our engineers review every BOM for long-lead and obsolete parts before production to protect your schedule.

Contact Our Shenzhen Factory

Email: Gelant.lei@kilandu.com
Phone and WhatsApp: +86 135 3093 1324
Address: Floor 2, No.145-3, Furui Road, Xintian Community, Fuhai Street, Bao'an District, Shenzhen, Guangdong, China

Frequently Asked Questions

1、Whether the product quality can meet industry standards and long-term use needs

Whether a PCBA build will meet the standards a buyer is held to, and keep working for years rather than months, is a fair question to ask before placing volume production. The honest answer is that it depends on which standards were specified, how the supplier proves compliance, and whether the manufacturing process is under enough control to reproduce the result next year as well as this one. Which standards actually apply to an assembly For a general industrial board the acceptance document is normally IPC-A-610, with Class 2 for dedicated service electronics and Class 3 for high-reliability applications where uninterrupted service is essential. IPC J-STD-001 governs the process side. Automotive programmes add IATF 16949:2016 on top, medical products add ISO 13485:2016, and material compliance is covered by RoHS and REACH. A supplier should be able to say which of these it holds, with certificate numbers and validity dates, rather than describing a general commitment to quality. How compliance is proved rather than asserted Proof comes from three places. First, incoming material control: components checked against the bill of materials and the approved-vendor list before they enter the line. Second, in-process inspection: solder paste volume verified with 3D SPI before placement, automated optical inspection after reflow, and X-ray where BGA or other joints are hidden. Third, outgoing records: lot-level traceability that ties the finished assembly back to the component lots, the reflow profile and the test result. Long-term reliability Longevity is mostly decided by things that never appear on the final inspection sheet. Moisture sensitive packages handled outside their floor-life window will crack during reflow and fail later. Boards that exceed the glass transition temperature of their laminate during assembly can pass electrical test and open up in the field. Electrostatic discharge damage can leave a marginal device that works today and drifts out of specification next month. Control of those three variables is what separates a supplier that can meet a long-term requirement from one that can meet a one-off order. What Kilandu provides Kilandu (Shenzhen Jintianlei Innovation Technology Co., Ltd.) builds turnkey PCBA in Baoan District, Shenzhen under IATF 16949:2016, ISO 9001:2015, ISO 13485:2016 and ISO 14001:2015 certified systems, to IPC-A-610 Class 2 and Class 3 acceptance criteria. Assembly runs on four Yamaha YS24 and YS12 SMT lines and three automatic DIP lines with roughly 150 million component placements per month, and every build ships with lot-level traceability, RoHS and REACH compliant materials, and a typical turnkey lead time of 2 to 5 weeks. Send your Gerber and BOM for a quotation

2、Whether the quotation is reasonable and the processing cost is too high

Quotation comparison is difficult because two figures that look comparable rarely are. One quotation may exclude tooling, another may assume a different surface finish, and a third may be based on a quantity break that will not apply to the real order. The way to judge whether a price is reasonable is to break it into its parts and compare like with like. What a PCBA quotation is made of Component cost against the BOM, including sourcing channel and any approved equivalents. Bare board fabrication: layer count, material, copper weight, surface finish and quantity. Assembly: stencil and programming setup, SMT and DIP labour, and the number of placement positions. Test: fixture cost where one is needed, plus test time per board. Packaging, documentation and, where applicable, certification or compliance testing. How to compare two quotations properly Fix the BOM revision, the surface finish, the acceptance class and the test specification first. Then check whether each quotation covers tooling and stencil separately or amortises it, whether the component cost is based on the same manufacturer part numbers, and what the stated lead time and minimum order quantity actually are. A lower headline price that omits test coverage or uses a different finish is not cheaper once the omitted items are added back. Where cost can legitimately come down Real savings come from design and planning rather than from pressure on the hourly rate. Improving panel utilisation reduces the bare board cost. Replacing an obsolete or single-source part with a pin-to-pin alternative removes a premium. Standardising the surface finish across products reduces setup. Consolidating quantity into fewer builds lowers the per-board setup share. And letting the assembler buy the material turnkey removes the margin stacking of a multi-vendor supply chain. How Kilandu prices Kilandu (Shenzhen Jintianlei Innovation Technology Co., Ltd.) quotes turnkey PCBA from Baoan District, Shenzhen with an open BOM cost breakdown rather than a single lump figure, so the buyer can see where the money goes. Long-lead and single-source parts are flagged early with proposed alternatives, and the factory runs four Yamaha YS24 and YS12 SMT lines and three automatic DIP lines with roughly 150 million component placements per month. Typical turnkey lead time is 2 to 5 weeks. Send your Gerber and BOM for a quotation

3、Whether large-volume orders can be delivered on time

Volume delivery depends on capacity that is actually installed, on a material plan that anticipates the parts with long lead times, and on a schedule that is monitored rather than assumed. A supplier who can answer with specific equipment numbers and a named capacity figure is in a better position to commit to a date than one who answers with an assurance. The capacity behind a commitment Kilandu operates four Yamaha YS24 and YS12 high-speed SMT lines and three automatic DIP lines in Baoan District, Shenzhen, with a monthly placement capacity of roughly 150 million components. Because fabrication and assembly sit in the same supply chain, bare board capacity and assembly capacity can be planned together rather than booked separately, which removes one of the common causes of a slipped schedule. What usually delays a volume order In most projects the binding constraint is not machine time, it is component availability. A single long-lead microcontroller, a specific connector or a custom magnetic can add weeks on its own. That is why a realistic schedule is built backwards from the material plan: long-lead items are identified and ordered first, buffer stock is held where the part is single-sourced, and any part at risk of obsolescence is raised early with a proposed pin-to-pin alternative. How progress is tracked Once a work order is released, material arrival, bare board readiness, SMT, DIP and test are tracked as separate milestones rather than as a single percentage. Customers are informed of progress at agreed intervals, and if a risk appears the buyer hears about it while there is still time to act on it rather than at the delivery date. Where a programme runs over several months, capacity can be reserved in advance so that later releases are not queued behind other work. Typical lead times Turnkey PCBA from Kilandu typically runs 2 to 5 weeks depending on component lead time, board complexity and quantity. The factory works under IATF 16949:2016, ISO 9001:2015, ISO 13485:2016 and ISO 14001:2015 certified systems to IPC-A-610 Class 2 and Class 3 acceptance criteria. Send your Gerber and BOM for a quotation

4、After the product has problems, the manufacturer's response speed and problem-solving ability

When a product problem appears in the field or on the line, what matters is how quickly and how thoroughly the manufacturer responds. Kilandu provides after-sales service and technical support with round-the-clock response, and treats each case as a traceable quality record rather than a one-off conversation. What the response actually involves Fast initial acknowledgement and a named technical contact for the case. Production records pulled for the affected lot, including reflow profile and inspection data. Joint analysis of the board and the reported failure, with the customer in the loop. A corrective action agreed and applied, with containment for stock already produced. Why this is possible Every build carries lot-level traceability from component sourcing through SMT placement, DIP, AOI and X-ray inspection to final test, so when a question is raised there is a production record to examine. Kilandu works under ISO 9001:2015, ISO 13485:2016 and IATF 16949:2016 certified quality systems, which require documented corrective and preventive action rather than informal resolution. Send your Gerber and BOM for a quotation

5、Whether the manufacturer is stable

Whether a manufacturer is stable is a fair question before placing volume production, and it is usually answered by evidence rather than by assurances. The relevant evidence is the history of the business, its market position, the customers who keep placing repeat orders, and the depth of the technical team behind the factory. What to look at Company history and the length of relationships with existing customers. Certifications actually held, with certificate numbers and validity periods. Production capacity and equipment installed, not only what is advertised. Engineering headcount, since it determines how much support a project receives. Kilandu in these terms Shenzhen Jintianlei Innovation Technology Co., Ltd. operates a PCBA factory in Baoan District, Shenzhen, serving more than 3,000 OEM customers across Europe, Russia and the Americas. The plant runs four Yamaha SMT lines and three automatic DIP lines with roughly 150 million placements per month, and employs around 150 people including more than 20 engineers. Quality systems are certified to IATF 16949:2016, ISO 9001:2015, ISO 13485:2016 and ISO 14001:2015. Send your Gerber and BOM for a quotation

6、Whether the supply of components and raw materials is stable

Component supply is the part of a PCBA programme that is least under the buyer's direct control, so the question is really about which channels a supplier buys through and what happens when the market tightens. A stable supply position is built from sourcing discipline, contractual relationships and planning ahead of the shortage rather than reacting to it. Sourcing channels and traceability Components are sourced from authorised and franchised distributors wherever the part is available through them, which keeps the material traceable and controls counterfeit risk. Every lot can be tied back to its supplier and date code, and incoming material is checked against the BOM and the approved vendor list before it is released to production. Where a part can only be obtained outside the authorised channel, that is raised with the customer rather than decided silently. Long-term agreements and inventory For parts that appear across several products, long-term agreements cover passives, connectors, microcontrollers and power devices so that pricing and allocation are known in advance. Where a part is single-sourced or has a history of allocation, buffer stock is held against forecast demand, and customers running repeat production can have material reserved for their programmes. Long lead time and end of life The two events that damage a schedule most are a long lead time appearing without warning and a part going end of life mid-programme. Both are manageable if they are seen early. Kilandu flags long-lead and single-source parts at quotation stage, tracks manufacturer lifecycle notices, and proposes pin-to-pin or functionally equivalent alternatives with a documented comparison so the customer can approve a substitution on evidence rather than on trust. Where a last-time buy is the right answer, the required quantity and storage plan are agreed before the part disappears. Why location helps The factory sits in Baoan District, Shenzhen, inside one of the densest electronics supply clusters in the world. That gives fast access to components, PCB fabrication and tooling, and it shortens the loop when an engineering change or a rework has to turn around quickly. Monthly placement capacity is roughly 150 million components across four Yamaha YS24 and YS12 SMT lines and three automatic DIP lines, with typical turnkey lead time of 2 to 5 weeks. Send your Gerber and BOM for a quotation

7、Whether the product meets environmental standards and industry regulations

Environmental and regulatory compliance is not a single certificate that is obtained once. RoHS and REACH are updated regularly, individual markets add their own restrictions, and a product that was compliant at launch can fall out of compliance when a component changes. The practical question for a buyer is what documentation the supplier can produce and whether the material decisions were made with those obligations in view. RoHS and REACH Kilandu builds with lead-free processes and RoHS and REACH compliant materials. That covers the flux chemistry and solder alloy used in production as well as the components and laminate specified for the board. Material declarations and RoHS and REACH statements are available on request, and for customers who need to report against a restricted substance list, the relevant documentation can be issued with the shipment. Environmental management The factory operates under an ISO 14001:2015 certified environmental management system, which covers how process waste, solder dross, cleaning agents and packaging are handled, and it works within Shenzhen's environmental, health and safety regulations. Packaging can be specified to reduce single-use plastics where the customer's own environmental commitments require it. Other regimes worth planning for Depending on where a product is sold, additional obligations may apply: WEEE take-back in the European Union, conflict minerals reporting under the relevant disclosure rules, California Proposition 65 warnings, and country-specific packaging and battery regulations. These sit with the brand owner rather than with the assembler, but they depend on information the assembler holds, so it is worth agreeing at the start what data has to be passed upstream and in what format. How compliance fits with quality Certifications held by Kilandu (Shenzhen Jintianlei Innovation Technology Co., Ltd.) are IATF 16949:2016, ISO 9001:2015, ISO 13485:2016 and ISO 14001:2015, and assembly follows IPC-A-610 Class 2 and Class 3 acceptance criteria. Production runs on four Yamaha YS24 and YS12 SMT lines and three automatic DIP lines with roughly 150 million placements per month, and records are retained per lot. Send your Gerber and BOM for a quotation

8、Customers have strict requirements for the confidentiality of PCB design and are worried that confidential information will be leaked to competitors

A customer's board design is the commercial asset the whole project rests on, and protecting it is a legitimate condition of doing business rather than a favour. The question to settle before releasing Gerber files is how those files are stored, who inside the factory can see them, and whether anything about the design will appear anywhere outside the project. How confidentiality is handled Kilandu works under confidentiality agreements and will sign a customer's own NDA where one is required. Design data, schematics, Gerber files and BOMs are held for the project only and are not disclosed to third parties, not reused for other customers and not reproduced in marketing or reference material. Project files are kept under access control, so the people who can open them are the engineers and production staff who need them to build the boards. Where the risk usually sits In practice a design leaks through the edges of a supply chain rather than from its centre. A subcontracted process step, a stencil or tooling supplier, a courier label, or an unstructured email attachment each create a copy that nobody is tracking. The way to control that is to keep the number of parties who see the whole design as small as possible and to put the handling rules in writing before the first file is sent. Practical measures A signed agreement in place before design files are released. Named project owner inside the factory, with access limited to the staff who need it. Design files stored on controlled systems rather than circulated by personal email. Customer-owned tooling, stencils and fixtures identified and kept for that programme. No use of customer designs, images or part numbers in public material. Working with your own agreement Most buyers already have a standard NDA, and using it is usually faster than negotiating a new one. What matters is that it covers the design data, the tooling and the production records, and that it says what happens when the programme ends. Kilandu (Shenzhen Jintianlei Innovation Technology Co., Ltd.) builds turnkey PCBA in Baoan District, Shenzhen under IATF 16949:2016, ISO 9001:2015, ISO 13485:2016 and ISO 14001:2015 certified systems, serving more than 3,000 OEM customers, and is accustomed to operating under customer confidentiality terms. Send your Gerber and BOM for a quotation