A DC fast charger is a power conversion product with a network interface attached, not a control product with a power stage attached. Inside the cabinet, alternating current is rectified, regulated to a DC bus, then converted again to the voltage the vehicle is asking for. That chain is built from several boards, and each one carries a different manufacturing problem: switching loss and gate drive on one, current sensing on another, isolation monitoring on a third. Kilandu assembles these boards as part of our EV charger PCBA work, and this page sets out what changes when the output is measured in hundreds of amps rather than tens.
Why a DC board cannot be built like an AC board
An AC station switches mains to the vehicle and measures it. A DC station manufactures a voltage. The difference propagates through the whole build:
- Heat is continuous, not incidental. A 60 kW module running at 96 % efficiency still has to move roughly 2.5 kW somewhere. That heat leaves through the board, through a thermal interface, into a cold plate.
- Current is high and the loop is short. Hundreds of amps through a busbar creates voltage drops and magnetic fields that a control board never sees. Placement and loop area stop being layout preferences and become electrical parameters.
- Voltage is high enough to matter for spacing, on every layer. A DC bus in the 700 to 800 V class changes creepage, clearance and the thickness of the insulation between copper layers.
- Registration between boards is mechanical. Power stacks are bolted together through busbars and press-fit pins; a 0.3 mm positional error becomes an assembly problem at the cabinet, not at the SMT line.
The board set inside a DC charger
| Board | Function | Distinctive build demand |
|---|---|---|
| PFC / rectifier board | AC input rectification and power factor correction | Heavy copper, large through-hole devices, thermal pad area, high creepage at the input |
| DC-DC conversion board | Isolated conversion from the DC link to the output range | Isolation distance through the transformer and across the board, high dv/dt, gate drive loop area |
| Gate driver board | Isolated drive for SiC MOSFETs or IGBTs | Fine-pitch, tight timing, creepage between primary and secondary side of the driver |
| Current and voltage sensing board | Shunt, Hall or fluxgate measurement, signal conditioning | Kelvin connections, thermal EMF control, shielding from the switching field |
| Controller board | Output regulation, CAN to the vehicle, Ethernet or 4G to the backend, insulation monitoring | Mixed-signal SMT, isolation barrier, firmware and calibration |
| Charging interface board | CC1 and CC2 detection, lock drive, temperature sensing in the connector | Connector-side routing, inductive load suppression, test access |
| Auxiliary and protection board | Pre-charge, contactor drive, discharge, surge and fuse monitoring | Through-hole contactors, high-current terminals, sequence verification |
Most programmes split these across three to six boards rather than integrating everything. That is a manufacturing decision as much as an electrical one: a board that mixes a 700 V bus, a shunt at 300 A and a 0.4 mm pitch microcontroller forces compromises in copper weight, in via structure and in reflow profile that no single stack-up satisfies well.
Copper weight and the current path
The output side of a 60 kW module at 500 V carries 120 A. At 200 V it carries 300 A. The board has to move that current with a temperature rise the enclosure can live with, and the enclosure is usually a sealed cabinet with a cold plate rather than open air.
Three constructions cover most of what reaches us:
- Heavy copper layers. Our heavy copper range starts at 2 oz and runs to 6 oz as a typical working range on power layers. Above that, the artwork has to be assessed against the minimum trace width that can be etched reliably at the thickness — the constraint is the etch, not the plating.
- Local copper blocks. Where current concentrates at a terminal or under a device, a 3 to 20 oz block is embedded locally rather than raising the whole layer. This is a local thickness, not a layer-wide one, and it is what allows a mixed board to carry 300 A without turning the signal layers into 6 oz copper.
- Busbars and laminated bars. Above a certain current the board stops being the conductor. The busbar is bolted or press-fit to the board, and the board's job is to receive it with a joint that survives thermal cycling rather than to carry the current.
Thermal path: from junction to cold plate
On a DC board the thermal path is a designed feature with several joints, and the weakest joint sets the result. A typical path runs from the die, through the die attach and the package base, through a thermal interface material, into the board's copper, through thermal vias into an inner or bottom copper plane, through a second interface, into the cold plate.
What we control in assembly is the middle of that chain:
- Voiding under thermal pads. A power package with a large exposed pad needs a controlled void fraction in the solder joint, not just "soldered". Voiding is inspected by X-ray on selected builds and the acceptance limit is agreed with the customer rather than assumed.
- Via array under the pad. The vias have to be filled or capped before assembly, otherwise solder wicks down the barrels and starves the joint. Filled and plated over is the normal construction for this class of board.
- Board flatness. A thick, asymmetric stack can bow during reflow. On a board that bolts to a cold plate, flatness is a functional requirement, and we check it after reflow rather than after fabrication.
- Cold plate interface. Where the customer supplies the cold plate, the assembly drawing has to state the interface material, the torque and the pattern. Where it does not, we raise it at DFM — a thermal path with an unspecified interface is not a thermal path.
Isolation on a high-voltage board
Two isolation barriers exist on a DC charger and they are often confused. The first is the barrier between the mains or DC bus and the control electronics. The second is the barrier inside the isolated DC-DC stage, between primary and secondary. Both are governed by the same standard family, IEC 60664-1 for distances and the relevant product standard for the required insulation level, but the numbers differ because the working voltage and the pollution degree differ.
What goes wrong at manufacture rather than at design:
- Inner-layer copper crossing under a slot. The outer layers show a clean gap and an inner plane bridges it.
- Via annular rings inside the barrier. A via placed for routing convenience reduces the effective distance, and the reduction is invisible in a visual inspection.
- Coating bridging a slot. Coating is applied for moisture protection, but where the design relies on distance, coating over the gap can restore conductivity across a pollution path.
- Test points and mounting holes. A mounting hole with a plated barrel and a ground ring inside the barrier is a common review finding.
These are checked at DFM review against the actual stack-up. Where a customer's design has already been certified, we still verify against the stack-up we are building, because a laminate or layer-count change moves distances that were qualified on a different construction. Multilayer construction rules apply as soon as the board exceeds four layers with a high-voltage section.
Current sensing: where accuracy is won or lost
Output current on a DC charger is measured either with a shunt and an isolated amplifier, with a Hall sensor, or with a fluxgate transducer. Each has a different assembly consequence.
| Method | Assembly requirement | Typical failure if done badly |
|---|---|---|
| Shunt | Four-wire Kelvin connection, symmetric copper, thermal EMF control, isolated amplifier close to the shunt | Drift with temperature, offset that shows up as a metering error at low current |
| Hall sensor | Defined air gap, no ferromagnetic material nearby, supply decoupling at the sensor | Gain error and crosstalk from adjacent conductors |
| Fluxgate | Mechanical mounting precision, cable routing away from switching nodes | Noise floor that limits low-current resolution |
The assembly contribution to accuracy is mostly symmetry and thermal coupling. A shunt whose sense traces run unequal lengths picks up a voltage proportional to the current gradient in the copper, not to the current through the shunt. We raise this at DFM because it is cheap to fix in artwork and expensive to fix in calibration.
Gate drive and switching loop
SiC MOSFETs switch faster than the IGBTs they replace, which is the point, and which also makes the gate loop and the power loop layout part of the electrical design rather than a routing detail. On the assembled board the visible consequences are ringing, overshoot and, in the worst case, device failure at commissioning.
What we control: the gate resistor and the return path are placed as specified, the driver's isolation barrier is not crossed by a signal trace, and the power loop area under the switching devices is kept as the customer's layout intends. Where the board carries a Kelvin source connection, it is verified at ICT rather than assumed from the netlist.
Insulation monitoring and the charging interface
An ungrounded DC output has to be monitored for insulation faults before and during a session, and the measurement is made against the chassis. The monitoring circuit is on the controller board, but its wiring passes through the high-voltage region, so its creepage and its filter components follow high-voltage rules even though the measurement itself is low voltage.
The charging interface board handles CC1, CC2, the lock and the connector temperature sensors. A temperature sensor inside the connector is short, thin and routed through a moving assembly; on the board it is a low-level analogue input sitting next to a lock solenoid driver. We check the input filtering and the return path at DFM, because a temperature reading that jumps when the lock actuates is a field failure that looks like a connector fault.
Assembly constraints
| Parameter | Capability |
|---|---|
| Layer count | 2 to 24 layers; thick-copper constructions to 32 layers on assessment |
| Copper weight | 1 oz signal; 2 oz to 6 oz on power layers; copper blocks 3 to 20 oz locally |
| Finished thickness | 0.8 mm to 6.0 mm typical; heavier on request |
| Minimum drill | 0.2 mm mechanical; laser vias on HDI constructions |
| Via treatment under thermal pads | Filled and plated over, or plugged, per the thermal requirement |
| Press-fit | Press-fit terminals and connectors assembled on the line |
| Through-hole | Wave or selective soldering; large terminals hand-soldered where mass requires it |
| Conformal coating | Acrylic, polyurethane or silicone, high-voltage regions masked to drawing |
| Board size | Standard panel up to 225 × 112 mm; larger panels on request |
Bare boards come from our own PCB fabrication operation, which shortens the loop when a thermal or isolation change requires a stack-up revision. Through-hole assembly handles the contactors, terminals and busbar joints, and SMT assembly covers the control, driver and sensing boards.
Test plan for a DC board
The test sequence is built around the fact that a failure here can destroy hardware. Power stages are brought up in a controlled order, with current-limited supplies and interlocks, rather than being switched on at full bus voltage.
| Stage | What is checked |
|---|---|
| SPI, AOI, X-ray | Paste volume, placement, and voiding under power packages and area-array devices |
| ICT | Opens, shorts, component values, Kelvin connections, driver-to-device continuity |
| Isolation check at board level | Resistance between the isolated domains, at the voltage the customer specifies. Board-level high-voltage proof testing is not a service we publish; where the design requires it we agree the method with the customer's own laboratory so the result is reported the way their qualification file expects. |
| Low-voltage functional test | Gate drive timing, sensing chain linearity, communication link, protection logic at reduced bus voltage |
| Power-on sequencing | Pre-charge, contactor close, soft start, output regulation across the specified range, controlled shutdown |
| Protection behaviour | Over-current, over-voltage, under-voltage, over-temperature, insulation fault response; trip and recovery recorded |
| Communication | Session handshake with the vehicle side, backend link over the interface fitted |
| Burn-in | Agreed duration at agreed load, where the programme specifies it |
Fixtures for this class of board are a project in themselves. Where no fixture exists, we build one — the PCBA testing page covers fixture and program development, and this answer explains what each method catches and what it does not.
Common failure modes on DC boards
- Voiding under a power pad. Passes electrical test, fails thermal test or fails in the field after a few hundred cycles.
- Unbalanced shunt sensing. Metering error that appears only at high current, where the copper gradient is largest.
- Board bow after reflow. Cold plate contact is partial, and one module in a rack runs hotter than its neighbours.
- Inner-layer copper across an isolation slot. Found at a customer audit, not at our test, unless it is checked at DFM.
- Substitution of a high-voltage device. The build works and the certification file no longer matches the bill of materials.
- Coating on a busbar joint or a terminal. Resistance rises, heat follows, and the fault is attributed to the busbar.
What we need to quote
Gerbers with drill data and stack-up, a BOM with manufacturer part numbers, the DC output range and maximum current, the cooling method and the cold plate interface drawing, the isolation requirement as the customer's qualification file states it, the connector type, the expected quantity and the acceptance class. Where a power stack is bolted together, the mechanical drawing of the stack matters as much as the electrical schematic.
Prototype builds run in 5 to 8 working days with components in stock, volume production in 2 to 5 weeks, and repeat orders in 2 to 3 weeks. There is no fixed minimum order quantity. Long-lead power devices are the usual constraint on the schedule, so the sourcing conversation belongs at quotation, not after the order — see component sourcing and the MOQ and lead time page. The assembly cost calculator gives a first indication, and the cost breakdown explains which factors move it.
Frequently asked
Can you assemble SiC and IGBT power stages on the same line as control boards?
Yes. The constraint is not the line but the process route: a power board with 6 oz copper and large thermal pads needs a different reflow profile and different inspection from a control board, so they run as separate builds and are joined at the cabinet. The charging pile controller page covers the control side separately.
Do you build the power module, or only the board inside it?
We build the boards that go into the module — driver, sensing, control and auxiliary — and assemble components onto them. The module's substrate and its housing are outside our scope. The EV charging module PCBA page explains where the boundary sits.
How is a 300 A joint inspected?
By X-ray for voiding where the joint is hidden, and by cross-section on the first article where the customer's specification calls for it. Visual inspection of a busbar joint proves very little; the acceptance criterion has to be a void fraction and a torque value, agreed before the build.
Can you work to a stack-up that is already certified?
Yes, and we prefer to. Send the qualified stack-up with the Gerbers. If a laminate is no longer available and a change is unavoidable, we raise it before production rather than substituting during production, because the substitution would move distances the qualification was based on.
Why Kilandu
Fabrication and assembly are under one quality system: IATF 16949:2016 (certificate 0596984), ISO 9001:2015 (CN27125Q0392R0S), ISO 13485:2016 (35825MDQMS0021R0S), ISO 14001:2015 (CN27125E0142R0S), UL file E352816. Acceptance is stated by IPC-A-610 class, inspection gates are described on the quality assurance page, and plant capacity is on factory capabilities. Assemblies can be delivered as boards or as a box build, and sourcing, fabrication and assembly can be taken as one turnkey scope.
Send the stack-up and the output specification. Current, voltage range, cooling method and isolation requirement are enough for a first engineering response and a price against your quantity.
Contact the engineering desk · EV charger PCBA overview · AC charger boards · Why Kilandu